Clemson, SC
The project included the removal of several large trees, concrete sidewalks, existing drainage structures, and steps leading to several buildings located in and around the plaza. Following the demolition, new drainage pipe was installed, which included new catch basins and drop inlets. New curved sidewalks, brick pavers and large grassed berms with flower beds, bicycle racks and decorative park benches finished off the project.